DIVISION OF WATER QUALITY UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY PUBLIC NOTICE OF REISSUANCE OF A UPDES PERMIT


Print PageEmail PageShareGet Reprints

    
DIVISION OF WATER QUALITY
UTAH DEPARTMENT OF ENVIRONMENTAL 
QUALITY
PUBLIC NOTICE OF REISSUANCE OF A UPDES PERMIT

PURPOSE OF PUBLIC NOTICE

	THE PURPOSE OF THIS PUBLIC NOTICE IS TO DECLARE THE STATE OF UTAH'S
INTENTION TO REISSUE A UTAH POLLUTANT DISCHARGE ELIMINATION SYSTEM
(UPDES) PERMIT UNDER AUTHORITY OF THE UTAH WATER QUALITY ACT, SECTION
19-5-106 AND 107, UTAH CODE ANNOTATED 1953, AS AMENDED.  SAID "PERMIT"
REFERS TO UPDES PERMIT AND THE STATEMENT OF BASIS (INCLUDING THE TOTAL
MAXIMUM DAILY LOADS (TMDL'S)) IF APPLICABLE, AS PER SECTION 303 (d) OF
THE FEDERAL CLEAN WATER ACT (CWA).
 
PERMIT INFORMATION
	PERMITTEE NAME: 	Pacificorp Huntington Power Plant
	MAILING ADDRESS        P.O. Box 680, Huntington, UT 84528			TELEPHONE
NUMBER:	(801) 220-4209
	FACILITY LOCATION:	Emery County, approximately 
				6 miles northwest of Huntington, UT
	UPDES PERMIT NO.:	UT0025607
	OUTFALLS:		001
	RECEIVING WATERS:	Colorado River

BACKGROUND
	Huntington Power Plant (HPP) is a 960 megawatt (MW) coal fired steam
electric generation facility.  The facility is located in Emery
County, Section 1, Township 17 South, Range 7 East, approximately 6
miles northwest of Huntington, UT on Highway 31.  Storm water runoff
and naturally occurring spring water from an un-named local wash is
potentially impacted by groundwater contamination from the two ash
landfills on the site.  This water is collected and can be discharged
through a metal culvert into Huntington Creek.  Generally it is pumped
to two holding ponds where it is mixed with process water and spray
irrigated onto the farm field found on the facility.  The discharge
from the spray irrigation is regulated under the facility's
groundwater permit.  

PUBLIC COMMENTS
	This comment period has been extended.  Public comments are invited
any time prior to the deadline of the close of business on December 2,
2013.   Written public comments can be submitted to: Lonnie Shull,
UPDES Engineering Section, Utah  Division of Water Quality, P.O. Box
144870, Salt Lake City, Utah 84114-4870 or by email at:
lshull@utah.gov.  After considering public comment the Utah Water
Quality Board may execute the permit reissuance, revise it, or abandon
it.

	The permit is available for public review under "Public
Participation" at www.waterquality.utah.gov.  If internet access is
not available, a copy may be obtained by calling Lonnie Shull at
801-536-4394.  
Published in the Emery County Progress November 19, 2013.
    
    

These legal notices, along with those from other fine Utah newspapers, can be viewed at www.utahlegals.com.


Print PageEmail PageShareGet Reprints


Top of Page


 
Legal Notices  
November 19, 2013
Recent Legal Notices
Quick Links
Subscribe via RSS
Related Articles  
Related Stories



Best viewed with Firefox
Get Firefox

© Emery County Progress, 2000-2008. All rights reserved. All material found on this website, unless otherwise specified, is copyright and may not be reproduced without the explicit written permission from the publisher of the Emery County Progress.
Legal Notices & Terms of Use    Privacy Policy    Advertising Info    FAQ    Contact Us
  RSS Feeds    News on Your Site    Staff Information    Submitting Content    About Us
z