Classifieds Business Directory Jobs Real Estate Autos Legal Notices Forums Subscribe Archives
Today is December 20, 2014
home news sports feature opinionhappenings society obits techtips

Front Page » March 31, 2009 » Opinion » Letter to the editor: MK Tunnels
Published 2,090 days ago

Letter to the editor: MK Tunnels


Print PageEmail PageShareGet Reprints

By ELI PEARSON
Salt Lake City

Editor,

It is with sincere hope that the MK Tunnel closure efforts don't result in a greater public liability and hazard than what existed initially. In viewing the images of the bat grating and concrete work, I couldn't help but ask myself questions about the design and engineering.

Did the public and industry professionals have any opportunity to view and approve the closure plans from engineering integrity to evaluating resulting aesthetics? Or was there a requirement that the planning/engineering was approved by appropriate professionals? What checks and balances are in place to ensure a robust design?

The beams spanning the bat grating do not appear to be sustainable, and interesting enough, there are no 90 degree reinforcements. How are the longer bars keyed into the rock/surface?

The images of the work look like a hazard with a high likelihood of risk and failure. The hand of humans can have an adverse impact if the local public does not demand accountability.

Print PageEmail PageShareGet Reprints


Top of Page


 
Opinion  
March 31, 2009
Recent Opinion
Quick Links
Subscribe via RSS
Related Articles  
Related Stories



Best viewed with Firefox
Get Firefox

© Emery County Progress, 2000-2008. All rights reserved. All material found on this website, unless otherwise specified, is copyright and may not be reproduced without the explicit written permission from the publisher of the Emery County Progress.
Legal Notices & Terms of Use    Privacy Policy    Advertising Info    FAQ    Contact Us
  RSS Feeds    News on Your Site    Staff Information    Submitting Content    About Us
z