Print Page


Notice To Water Users

    
The State Engineer received the following Application(s) in Emery
County (Locations in SLB&M).

	For more information or to receive a copy of filings, visit
http://waterrights.utah.gov or call 1-866-882-4426.

	Persons objecting to an application must file a CLEARLY READABLE
protest stating FILING NUMBER, REASONS FOR OBJECTION, PROTESTANTS`
NAME AND RETURN ADDRESS, and any request for a hearing.  Protest AND A
$15 PROCESSING FEE MUST BE FILED with the State Engineer, Box 146300,
Salt Lake City, UT 84114-6300 ON OR BEFORE OCTOBER 24, 2011. These are
informal proceedings as per Rule R655-6-2 of the Division of Water
Rights. (The Period of Use is generally year-round except irrigation
which is generally from Apr 1 to Oct 31 each year.)

CHANGE APPLICATION(S)
91-148(a37668):  UtahAmerican Energy Inc. propose(s) using 0.3 cfs.
from groundwater (Horse Canyon Mine) for MINING.
91-149(a37669):  UtahAmerican Energy Inc. propose(s) using 0.1 cfs.
from groundwater (Horse Canyon Mine) for MINING.
91-150(a37670):  UtahAmerican Energy Inc. propose(s) using 0.1 cfs.
from groundwater (Horse Canyon Mine) for MINING.
                                            Kent L. Jones, P.E.
                                            STATE ENGINEER
Published in Emery County Progress September 27 and October 4, 2011.
    
    

These legal notices, along with those from other fine Utah newspapers, can be viewed at www.utahlegals.com.





Print Page